Build · Project management

The job, on the record.

Every RFI, submittal, drawing revision, daily log and lookahead sits on one record. The field writes to it from the floor it is standing on, the office reads the same line, and the version history keeps the date stamp and the author attached.

Sheet · project management
Record types
14
Open RFIs
38
Median response
3.2 D
Drawing revisions
1,204
Field users
UNLIMITED
Field sync
OFFLINE-FIRST
PM · TOWER 12 · L01–L41
RECORD · 6 WAYS IN · 1 SOURCE

What's in the record

Everything the job runs on.

Six ways in, one record underneath. Nothing here is a copy of something else, so nothing has to be reconciled at the end of the month.

RFI · OPEN 38 · MEDIAN 3.2D

RFIs & submittals

Raise an RFI from the level you are standing on, with the 360 frame that shows the problem already attached. Route it, log every reply, and close it against the drawing it belongs to — author and date stamp intact.

SHEETS · REV C · DIFF 14 LINES

Drawing control with revision compare

Current set, superseded set, and the difference between them. Overlay two revisions and only the changed lines light up, so nobody in the field builds from a sheet that was replaced on Tuesday.

LOG · DRAFTED 06:41 · SIGNED 07:02

Daily logs auto-drafted from capture

Weather, crews, trades on site, quantities placed and deliveries received arrive pre-filled from the morning walk and the dock flight. The superintendent corrects and signs.

LOOKAHEAD · 3 WK · 214 TASKS

Scheduling & lookaheads

Master schedule, three-week lookahead, and the constraint list that decides whether next week actually happens. Percent complete updates from capture instead of from a status meeting.

MINUTES · ACTIONS 27 · OVERDUE 2

Meeting minutes & action tracking

Minutes that carry owners and due dates out of the room with them. Every action links back to the RFI, submittal or revision that caused it, so the follow-up has its evidence attached.

FIELD · OFFLINE · SYNC 100%

Mobile field app

The whole record on the phone — offline in the basement, synced the moment the signal returns. Punch, photograph, mark up, sign, and keep walking.

RFI-0047 · S-412 REV C · CLOCK 7.0D

One record

One RFI, end to end.

Scroll and the record moves. Raised on the morning walk, routed to the architect of record, answered against the drawing, closed with the frame that started it — three point two days on a seven-day clock.

RFI-0047

Slab edge detail — Level 12 north bay

Discipline structural · Spec 03 30 00 · Specimen Builders

CLOSEDELAPSED 3.2 D / 7.0 D
Ball in court
CLOSED ON RECORD
Drawing
S-412 REV C
Schedule impact
0 D
Cost impact
$0
  1. OPEN14 MAR · 08:12

    Raised on the 07:40 ground walk. The 360 frame and the marked-up sheet attach themselves on send — nobody walks back to the trailer to file it.

  2. IN REVIEW14 MAR · 15:40

    Routed against S-412 Rev C. Two earlier RFIs on the same edge detail surface with their answers, so the question is asked once.

  3. ANSWERED16 MAR · 11:05

    Detail confirmed, no revision required. The answer lands on the drawing, the daily log and the three-week lookahead in the same second.

  4. CLOSED17 MAR · 09:30

    Closed against the frame that raised it. Three point two days, on a contract clock that allows seven.

RFI-0047 · CLOSED 3.2D · SOURCE 360 FRAMERaised in the field, closed on the record, in three point two days.
LOG-0316 · DRAFTED 06:41 · 3,412 FRAMES

Documentation

Documentation that writes itself.

The 06:05 ground walk and the 06:20 dock flight already know the weather, the crews on site, the trades working and the quantities placed. The log is drafted from them before the trailer opens.

Nothing is invented and nothing is assumed. Every field names where it came from, so signing the log is a review rather than a transcription. What the superintendent changes carries into the next day’s draft.

DAILY LOG · 16 MAR 2026Drafted 06:41 · unsigned
Weather
14°C · WIND 11 KM/H · DRY

FROM SITE STATION

Crews on site
6 CREWS · 84 HEADCOUNT

FROM GEOFENCE

Trades observed
CONCRETE · REBAR · MEP ROUGH-IN

FROM GROUND WALK 06:05

Quantities placed
142 M³ · L12 NORTH BAY

FROM DOCK FLIGHT 06:20

Deliveries
3 · REBAR, FORMWORK, ANCHORS

FROM LAYDOWN YARD

Delays
NONE RECORDED

FROM SCHEDULE

Open items raised
RFI-0047 · PUNCH 12-114

FROM FIELD APP

LOG-0316 · 3,412 FRAMES · DRAFTED 06:41AWAITING SUPERINTENDENT SIGN-OFF
LOG · DRAFTED FROM CAPTURE · DATED

The daily log is read off the record, not written from memory.

Drafted before the trailer opens

Every line carries its date and its frame

LOG · REVISION-TRUE · ON RECORD

56H

Saved per project manager, per month

3.2D

Median RFI turnaround across the portfolio

41

Towers running on one record

CONTACT · SALES · REPLY 1 BUS. DAY

Run the job on ground truth.

Bring us your open RFIs, your current drawing set and your worst month on the schedule. We will show you what the record does with them.