Skip to content

WIN · BID INTELLIGENCE

READ EVERYTHING. MISS NOTHING.

The Brain reads the whole tender — every drawing, every specification section, every page of the general conditions — before your first coffee. What comes back is a risk register with page numbers on it, not a summary you have to trust.

PRECON · 6 MODULES · 3.1× FASTER

THE MODULES

Precon, at reading speed.

Estimating teams lose bids to the packages they never had time to read properly. This reads all of them, the same way, every time — and shows its work.

PIPELINE · 4 STEPS · TENDER→BID

PACKAGE TO BID

Four steps, one afternoon.

This is a real sequence, so it is numbered honestly. A tender that used to take a week of nights lands on the estimator's desk structured, flagged, and priced before the day is out.

01 / 04

Read the package

The whole tender goes in — drawings, specs, addenda, the scanned general conditions nobody ever OCR'd. Eleven minutes later there is a structured record of what the owner is actually asking for.

INGEST · 1,842 PP · 11 MIN
02 / 04

Flag the risk

Twenty-seven findings ranked by exposure: liquidated damages, concurrent-delay language, escalation caps, allowances that were never priced. Each one carries its page and its clause.

FINDINGS · 27 · SEV1 3
03 / 04

Repackage by trade

Fourteen trade bundles cut from one package, each with only the sheets and sections that trade needs, ready to issue with a scope letter drafted from your standard template.

BUNDLES · 14 TRADES · 3 H
04 / 04

Price it from your own record

Rates from sixty-one completed jobs, escalation from the programs you actually ran, and a win probability scored against four hundred and twelve past bids.

EST · ±3.4% · WIN 38%
RECORD · 412 BIDS · 61 JOBS

ON THE RECORD

Bid more. Bid better.

3.1×

Faster bid turnaround

56H

Saved per PM per month

0%

Institutional knowledge lost

It found a liquidated-damages clause on page 412 that ran from certification, not turnover. That single finding was the margin on the job.

D. OkonjoChief estimator, Ironline MEPBID VOLUME 3.1× · WIN 38%
CITED · 100% · CLAUSE-LEVEL

ENTERPRISE AI BRAIN

Your standards, by default.

Your scope letters, your exclusions, your risk thresholds, your preferred contract language — loaded once as the rules the agents work to. The Brain bids the way your firm bids, and every finding it returns is tethered to the exact clause it came from.

Risk register

FINDINGS · 27 · CITED 100%
MERIDIAN CIVIC CENTRE · VOL 3 — GENERAL CONDITIONSSOURCE · 1,842 PP · READ 11 MIN
  1. §11.4 · PP 412

    Liquidated damages in the sum of eighteen thousand five hundred dollars ($18,500) per calendar day shall accrue from the date of Substantial Completion as certified by the Design Professional, and not from the date of beneficial occupancy or turnover of the Work.

  2. §9.2 · PP 388

    The Owner shall have twenty-one (21) calendar days from receipt to review and return each submittal. Any resubmittal shall restart the review period in full.

  3. §12.7 · PP 431

    No extension of Contract Time shall be granted for any delay that is concurrent with a delay caused or contributed to by the Owner, its consultants, or its separate contractors.

  4. §4.1 · PP 96

    Escalation shall be reimbursed to a maximum of two and one-half percent (2.5%) of the awarded trade package value over the full term of the Contract.

Select a finding to follow it back to the clause.

Showing §11.4 on page 412, the source of the finding “Damages run from certification, not turnover”.

Traceability is the whole point. An estimator who cannot check a finding will not stake a bid on it, so nothing here is offered without its source: the clause, the page, the revision, and the inference log entry that produced it. Human sign-off gates anything that leaves the building.

CONTACT · SALES · REPLY 1 BUS. DAY

Win the work you want.

Talk to our team about your portfolio, your sites, and what the Brain can learn from them.