Four production halls, a 10-tonne crane on its rail, and block foundations that were bought against a tolerance of ±2 mm. The building exists to serve the machines — Ground Reality carries the anchor set-out, the revision the block was poured to, and the services under the floor on one record, so the line sits down the first time it is craned in.
CAPTURE · INTERIOR PASS · 0.8CM DETAILCAPTURE · INTERIOR PASS · 0.8CM DETAILFOUNDATIONS ±2MM · HALLS 4 · SAT DAY ONEFOUNDATIONS ±2MM · HALLS 4 · SAT DAY ONE
The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.
HALL 3 · LINE 4 · SAT WK 41HALL 3 · LINE 4 · SAT WK 410.8CM DETAIL0.8CM DETAILWAYPOINTS 10WAYPOINTS 10
REC · AIRHALL 3 · LINE 4 · SAT WK 41
0.8CM DETAILSTATIONS24 / 24SPECIMEN SITE · ILLUSTRATIVE RECORD
LEGPOSTCARDALT+98MSPD30.5M/STOL ±2.0MMWP10 / 10
Sector · Manufacturing
THE CRANE CROSSES AT TWO POINT TWO.
Two hundred and twenty metres of production hall, flown down the middle of LINE 4 at sixteen — over the robot cells, under the haunch, and straight at a ten-tonne crane walking the other way with an eight-and-a-half-tonne machine slung under it. Two point two metres of clear air, measured. Then the unit walks the line and reads the eight anchors the machine has to sit on.
HALL 3 · 4 HALLS · SAT WK 41HALL 3 · 4 HALLS · SAT WK 41
On the record here
01
The machine was bought against a foundation tolerance of ±2 mm. Once grout goes in, an anchor set 4 mm high is a coring rig, a vendor claim and a line that misses the start date it was ordered for.
±2 mm, evidenced before the grout
The as-set survey runs as a gate on every block: eight anchors, departure from design in millimetres, the worst one named, signed before the grout is booked. The evidence lands against foundation F-12 and the dated frame that shows it, not in an email attachment.
QA checkpointsF-12 · 8 ANCHORS · MAX −1.9MM · GATEF-12 · 8 ANCHORS · MAX −1.9MM · GATE
02
The machine builder issues rev G of the anchor plan while the block is being poured to rev E. Nobody on the pour crew knew there had been a rev F, and the pocket now sits 60 mm from where the bolt has to be.
The revision the block was poured to
One controlled set: the current revision is what the field opens, superseded sheets are stamped, and a change lands in front of the crew that has to build it. Every block carries the revision it was actually poured to, on the record, for the day the vendor asks.
Drawing controlANCHOR PLAN REV G · SUPERSEDED · FIELDANCHOR PLAN REV G · SUPERSEDED · FIELD
03
Pits, ducts, cable trench and cooling runs are buried the day the machine lands on top of them. Two years later an upgrade needs the service route, and the only record is a drawing nobody has touched since tender.
What is under the machine, forever
Each hall is walked before the floor closes and again before the machines are set — frames pinned to the plan within ±0.3 m, dated, at the same vantage points. The trench stays open in the record long after it is closed on site.
360° walksHALLS 4 · PRE-CLOSE WALK · PIN ±0.3MHALLS 4 · PRE-CLOSE WALK · PIN ±0.3M
PL. 10HALL 3 · F-12 · 8 ANCHORS · MAX −1.9MM · TOL ±2.0 · SET 18 APR
HALL 3 · F-12 · WK 41HALL 3 · F-12 · WK 41
On the numbers
±2 MM
Set-out envelope every anchor is evidenced against
4
Production halls carried on one record through fit-out
0
Days lost to a machine that would not sit on its base
INDUSTRIAL · MANUFACTURING · 32 SECTORS ON THE SHEETINDUSTRIAL · MANUFACTURING · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · HALLS 4 · TOL ±2.0MMPROGRAM · HALLS 4 · TOL ±2.0MM
The capture program
The program runs on the machine schedule — the pour, the anchor set, the grout booking, the SAT. Every instrument on this list answers the same question: does the line land on day one?
InstrumentCadenceOn the record
01
Pre-close 360 walk
Before each floor closes, and again before machines set
Pits, ducts, cable trench and cooling runs are walked while they are still open — frames pinned to the plan within ±0.3 m — so the trench stays standing in the record long after the 250 mm floor closes over it.
The pass runs the halls at crane-rail level — portal frames, the 10 t crane on its rail, line 4's stations — so the building the machines are landing in is measured, not assumed.
A total station between the blocks shoots every anchor's departure from design level in millimetres and names the worst. F-12 closed at −1.9 mm, at B3 — signed before the grout was booked, re-shim nil.
TS 0.6MM @ 30M · ANCHORS 8/BLOCK · TOL ±2.0MMTS 0.6MM @ 30M · ANCHORS 8/BLOCK · TOL ±2.0MM
04
Landing watch
Every machine set, on the hook
The same instrument that surveyed the anchors watches the module come down, so the shims cut from the survey are the shims that fit. M-312 landed at 06:05 with grout booked for 09:30.
The machine was bought against ±2 mm. Who proves the base before the grout goes in?
The as-set survey does, as a gate: eight anchors on the block, each departure from design in millimetres, the worst one named and signed before grout is booked. F-12 closed at −1.9 mm at anchor B3 — inside the envelope, re-shim nil.
F-12 · MAX −1.9MM · TOL ±2.0MMF-12 · MAX −1.9MM · TOL ±2.0MM
Q02
What happens when the vendor reissues the anchor plan mid-pour?
The field only opens the current revision. Rev G lands in front of the pour crew the day it is issued, superseded sheets are stamped, and every block carries the revision it was actually poured to — for the day the vendor asks.
ANCHOR PLAN REV G · STALE SHEETS 0ANCHOR PLAN REV G · STALE SHEETS 0
Q03
Will the shims cut from your survey actually fit?
The same total station that shot the anchors — 0.6 mm at 30 m — watches the module come down. M-312 landed at 06:05 on shims cut from the 05:40 survey, and the grout went in at 09:30 with the evidence already attached to the gate.
What is under the machine when we need it in five years?
Still on the record. Every hall is walked before the 250 mm floor closes and again before the machines set — frames pinned within ±0.3 m, dated — so the cooling run under the line is a photograph, not a tender-era drawing.
PRE-CLOSE WALK · PIN ±0.3MPRE-CLOSE WALK · PIN ±0.3M
Q05
Does the block stay quiet once the line is running?
It is measured, not assumed: base vibration reads 2.8 mm/s, 98.6% of anchors are at torque, and both numbers ride the record through the SAT.
Line 4 ran its SAT with nothing outstanding underneath it — 24 stations at a 4.2-minute takt — and the job lost zero days to a machine that would not sit on its base.
LINE 4 · TAKT 4.2MIN · DAYS LOST 0LINE 4 · TAKT 4.2MIN · DAYS LOST 0
BRIEFS 3 · CITED 100% · SAT WK 41BRIEFS 3 · CITED 100% · SAT WK 41
Who reads it
Read overnight on a plant like this one: the as-set surveys, the drawing register, the pre-close walks and the crane plan for the morning's set. Three of the 27 profiles wake up to it.
F-12 gates the 06:05 lift: the as-set survey closes at 05:40 — worst anchor 1.9 mm low at B3, inside the envelope — so M-312 lands on schedule and the grout keeps its 09:30 booking.
CITES: AS-SET SURVEY 05:40 · F-12 · CRANE PLAN
Foreman
PROFILE 23 / 27
05:55 · HALL 3 · POUR BAY
TODAY
The anchor plan in your set is rev G — the pocket moved 60 mm from rev E, and E and F are stamped superseded. Pour to the sheet in your hand; it is the one the vendor will measure against.
CITES: ANCHOR PLAN REV G · DRAWING REGISTER · POUR PLAN
VDC manager
PROFILE 19 / 27
07:30 · HALL 3 · UNDERFLOOR
HANDOVER
Hall 3's trench and cooling runs are pinned to ±0.3 m and dated from the pre-close walk — when the line needs the service route in year five, the floor never has to be cored to find it.
CITES: PRE-CLOSE WALK · PIN ±0.3M · HALL 3
SHEET · 4 OF 48 · MANUFACTURINGSHEET · 4 OF 48 · MANUFACTURING
Send us the machine schedule and the anchor plans — we will run the as-set gate on your next block and hand you the evidence before the grout is booked.