EVERY HOME, ON SCHEDULE.

Six hundred and forty plots across four phases, each one at its own stage on its own day. Ground Reality flies the whole development twice a week, reads every plot's stage off the same capture, and names the street that will miss its closing date while there is still a trade movement left to fix it.

CAPTURE · 2×/WK · 1.8CM DETAILPLOTS 640 · CYCLE 92D · ON DATE 98%
CAPTURE · MISSION 16 · 1.8CM DETAIL

Capture · Mission 16

FLY THE SECTOR.

The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.

ESTATE 3.7AC · BEACHFRONT1.8CM DETAILWAYPOINTS 10

Sector · Housing

THE WHOLE ESTATE, ON RECORD.

Three and a half acres of beachfront read in one governed pass — the house, the pool rim, the paddock rail, twenty-two metres of jetty — then the unit walks the deck and captures what a listing never shows: the tile lippage, the loose fixing, the board gaps. Sold by viewing, proven by survey.

DEVELOPMENT · 640 PLOTS · 4 PHASES

On the record here

  1. 01

    Plot status comes off a drive-around and a spreadsheet. By the time the sheet reaches the sales office it is four days old and three plots are wrong.

    Every plot, one flight

    One flight covers the whole development at 1.8 cm detail. Every plot is staged off that single capture — slab, frame, roof, clad, complete — so the phase board is rebuilt from what is standing rather than from what was reported on Monday.

    Orthomosaic mapsPLOTS 640 · STAGES 5 · 1 FLIGHT
  2. 02

    The programme says phase 3 closes in September. It says that because it said so in March, and nobody has re-cut it against the rate the roofs are actually going on.

    Lookaheads that read velocity

    Lookaheads are built from measured cycle time — 92 days a plot, street by street — so a slipping trade reads as a date, not a colour. The four-week view names the plots that will miss and the movement that saves them.

    Scheduling & lookaheadsCYCLE 92D · WK-34 · SLIP FLAGGED
  3. 03

    A buyer walks their home two days before completion and finds eleven things. Every one of them is now a legal date, a contractor callback and a phone call to the sales office.

    Snags closed before the keys

    The pre-completion walk is captured and tagged on the frame: point at it and it lands in the record assigned to a trade with a due date. Twelve seconds a snag — and the plot's whole history is still there when the buyer asks about it in year two.

    Punch & issue taggingTAG→ASSIGN 12S · PLOT 214 · 11 ITEMS
BUILD CYCLE · 92 DAYS · DAY 61
PL. 01
PHASE 3 · DAY 61 OF 92 · FLIGHT 07:10 · BOARD 17:30
PHASE 3 · 640 PLOTS · WK 34

On the numbers

640

Plots on one development, staged off one flight

92 DAYS

Measured slab-to-keys cycle, street by street

98%

Closings that land on the date the buyer was given

BUILDINGS · HOUSING · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · 2×/WK · 640 PLOTS

The capture program

The program runs on the sales calendar: two flights a week, a walk before every completion, and a stage board rebuilt from capture by 17:30 — 640 plots, and nobody drives the streets with a clipboard.

  1. 01

    Development flight

    2×/week, at 07:10, before the first trade arrives

    One flight covers the whole development, and every plot is staged off that single capture — slab, frame, roof, clad, complete. The board is rebuilt from what is standing, not from what was reported on Monday.

    1.8CM DETAIL · 640 PLOTS · 35MIN
  2. 02

    Plot orbit

    On the plots at clad, while the scaffold still stands

    The scaffolded elevation is orbited close before the scaffold is struck, so the clad stage carries the facade behind it on the record instead of behind the netting.

    ORBIT 24 STATIONS · PLOT 144
  3. 03

    Pre-completion walk

    Plot by plot, two days before the keys

    The walk the buyer would do is done first, on capture: point at a snag and it lands in the record assigned to a trade with a due date. The plot's history is still there when the buyer asks in year two.

    TAG→ASSIGN 12S · PLOT 214 · 11 ITEMS
  4. 04

    Stage read

    Every flight, board rebuilt by 17:30

    Each plot is read against its stage and the lookahead is re-cut from measured cycle time — 92 days a plot, street by street — so a slipping trade reads as a date, not a colour.

    PLOTS 640 · STAGES 5 · CYCLE 92D
ASKED · 5 QUESTIONS · 5 FIGURES

Ask the record

  1. Q01

    How current is the stage board?

    As current as this morning. The whole development is flown in 35 minutes at 1.8 cm detail and the board is rebuilt by 17:30 the same day — the four-day-old spreadsheet with three plots wrong is gone.

    FLIGHT 35MIN · BOARD 17:30
  2. Q02

    Which street misses its closing?

    The one the lookahead names, weeks out. The programme is cut from the measured 92-day cycle street by street, so the four-week view reads the roof rate and moves the crews — Friday's cut put two roofing crews onto Larkspur Street.

    CYCLE 92D · SLIP READS AS A DATE
  3. Q03

    What does the buyer's walk look like?

    Short. Plot 214 was walked before completion and its eleven items were tagged on the frame — twelve seconds a snag, each one assigned to a trade with a due date, closed before the keys instead of after the phone call.

    PLOT 214 · 11 ITEMS · TAG 12S
  4. Q04

    Can one record carry all four phases?

    Yes — 640 plots across four phases, staged off the same flight, on one record. The sales office, the site team and the lookahead all read the same board, cut to their own morning.

    PLOTS 640 · PHASES 4 · 1 FLIGHT
  5. Q05

    What do we tell the buyer at reservation?

    The date — and mean it. Closings land on the day they were sold 98% of the time, because the plot that will miss is named at week 34 while there is still a trade movement left to fix it.

    CLOSINGS ON DATE 98%
BRIEFS 3 · PROFILES 27 · FIRST CUT 05:40

Who reads it

Read overnight on a development like this one: two flights, the stage board, every open snag, and the week-34 lookahead. Three of the 27 profiles wake up to it.

Superintendent

PROFILE 04 / 27

05:40 · PHASE 3 · LARKSPUR ST

SEQUENCE

Phase 3 is on day 61 of 92. The roof rate says Larkspur Street misses its closing unless two crews move — Friday's cut has them there, so hold the plaster gang where it is.

CITES: FLIGHT 07:10 · CYCLE 92D · LOOKAHEAD WK-34

CFO

PROFILE 11 / 27

06:55 · DEVELOPMENT · 640 PLOTS

CASH

Closings are the cash: 98% land on the date the buyer was given, and every completion this month carries its walk and its closed snags behind it.

CITES: STAGE BOARD 17:30 · CLOSINGS 98% · PLOT 214 WALK

Foreman

PROFILE 23 / 27

06:05 · PHASE 3 · PLOT 214

TODAY

Eleven items stand open on plot 214, each assigned with a due date and the frame that shows it — close them before the buyer's walk and the keys go on the day they were promised.

CITES: WALK 09:20 · 11 ITEMS · TAG→ASSIGN 12S

SHEET · 4 OF 48 · HOUSING

On the capability sheet

  1. AER-01

    Orthomosaic maps

    Survey-grade 2D maps from any drone flight

    1.8CM DETAIL · 214 HA/FLIGHT
  2. PMG-04

    Scheduling & lookaheads

    Lookaheads that read capture velocity, not optimism

    WK-34 LOOKAHEAD
  3. GRD-03

    Punch & issue tagging

    Tag an issue on the frame; it lands in the record assigned

    TAG→ASSIGN 12S
  4. GRD-04

    Progress by trade

    Percent complete by area across 80+ trades, no BIM required

    82 TRADES · MINUTES
The whole capability sheet4 OF 48 CAPABILITIES · THIS SECTOR

Figures are a specimen record, drawn to the platform's own conventions.