Skip to content
Ground Reality

EVERY SPAN, FROM EVERY SIDE.

Decks, piers and cables inspected by air and cataloged by element. Fourteen spans photographed from angles a rope team cannot hold, then split into 2,300 elements with every defect ranked, located and carried forward to the next cycle.

SPANS 14 · ELEMENTS 2,300 · CYCLE 2×/YRB-118 · SPANS 14 · ELEMENTS 2 300
CAPTURE · MISSION 06 · 0.6CM DETAIL

Capture · Mission 06

FLY THE SECTOR.

The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.

B-118 · SPANS 14 · ELEMENTS 2 3000.6CM DETAILWAYPOINTS 10

Sector · Bridges

FLY THE SPANS.

Under the deck and out the other side, span after span: the soffit, the bearings and the pier faces no rope team can hold a camera on — fourteen spans and 2,300 elements, without closing a lane.

RECORD · SPAN 7 · 3 ARGUMENTS

On the record here

  1. 01

    Inside a box girder and under a bearing shelf there is no aircraft and no rope. The condition of the diaphragms is whatever the last person who crawled in there wrote down, two years ago.

    The faces nobody can reach

    A tracked unit runs the box girder interiors and the pier chambers on a saved route, returning 360 imagery and readings at the same stations every cycle — no permit queue, no escort, no confined-space team standing by.

    Robotic inspectionBOX GIRDER · SPAN 7 · 14 STATIONS
  2. 02

    Deck soffit delamination does not show in a photograph. It shows as a warm patch an hour after the sun leaves the concrete, and only if somebody happens to be looking at the right time.

    Delamination read as heat, not as guesswork

    The soffit is flown for heat inside the cooling window and returned as a ΔT map tied to the element grid: every anomaly bounded, measured in square metres, and stacked against the same patch from the last cycle.

    Thermal & facade inspectionSOFFIT · ΔT 2.4°C · 41 ANOMALIES
  3. 03

    The inspection report is a PDF of 2,300 elements and 180 photographs. Six months later nobody can say which of the 41 defects got worse.

    Defects ranked, located and carried forward

    Every defect is an issue raised against a named element, with a location, a severity and a photograph, so the next cycle opens the same list and the trend is a column rather than an argument.

    Observations & issuesELEMENTS 2,300 · DEFECTS 41 · RANKED
HEAT PASS · SOFFIT · 20×6 PANELS
PL-01
DECK SOFFIT · SPAN 7 · ΔT 0.4–2.4°C · 41 ANOMALIES BOUNDED
NUMBERS · STRUCTURE · CYCLE 2×/YR

On the numbers

14

Spans captured from every face inside a single cycle

2,300

Elements cataloged, each carrying its own defect history

96 %

Inspection faces reached without rope access or a lane closure

CORRIDORS · BRIDGES · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · CYCLE 2×/YR · SPANS 14

The capture program

The program owes the traffic nothing — fourteen spans are captured from the air and from inside the box while both lanes keep running, and every face lands on the same element register twice a year.

  1. 01

    Structure flight

    Twice a year, without closing a lane

    Deck, soffit, shafts and abutments photographed from angles a rope team cannot hold. The model splits into 2,300 elements, and 96 % of inspection faces come back without rope access or a closure.

    IMAGES 4 200 · STATIONS 216 · 0.6CM DETAIL
  2. 02

    Pier orbit

    Pier by pier, two passes each, in one evening

    Each shaft is orbited at three levels from a 5.0 m standoff, holding the same 216 stations every cycle — so cycle four differences against cycle three instead of starting the argument over.

    ORBIT 3 LEVELS · STANDOFF 5.0M · STATIONS 216
  3. 03

    Soffit thermal pass

    In the cooling window, after the sun leaves the deck

    Delamination reads as heat an hour after sun-off. The soffit is flown for heat inside that window and returned as a ΔT map tied to the element grid, every anomaly bounded in square metres.

    SUN OFF 17:55 · FLOWN 19:20 · ΔT 2.4°C
  4. 04

    Box-girder run

    Each cycle, span by span, on a saved route

    A tracked unit runs the box interiors and pier chambers to the same stations every cycle, returning 360 imagery and readings — no permit queue, no confined-space team standing by.

    SPAN 7 · STATIONS 14
ASKED · 5 QUESTIONS · 5 FIGURES

Ask the record

  1. Q01

    Do we close a lane for the inspection?

    No. Fourteen piers are orbited two passes each in a single evening, the soffit is flown in the cooling window, and 96 % of inspection faces come back from the air or the gallery — traffic runs through all of it.

    FACES 96% · CLOSURES 0
  2. Q02

    Can you see delamination, or just photograph paint?

    The soffit is flown for heat after the sun leaves the concrete. The ΔT map bounds every warm patch on the element grid — 41 anomalies this cycle, up to 2.4 °C, each measured in square metres, not circled in marker pen.

    ΔT 2.4°C · ANOMALIES 41
  3. Q03

    What happens to 2,300 elements after the flight?

    Each defect becomes an issue against a named element with a location, a severity and a photograph — D-204's 40 mm spall at rank 3, D-118's 0.3 mm crack at rank 2 — and the next cycle opens the same list.

    ELEMENTS 2,300 · RANKED 1–5
  4. Q04

    How do I know which defect got worse?

    The trend is a column, not a re-survey. The same stations every cycle mean the span 7 patch at panel D-11 reads 1.8 m², grew 0.6 m² since last cycle, and was ranked against the previous list by 08:00 the next morning.

    PANEL D-11 · +0.6M² · RANKED 08:00
  5. Q05

    What about inside the box, where nothing flies?

    The tracked unit runs it — 14 stations through span 7 alone, the same route saved and repeated, so the diaphragms are a current record instead of whatever the last person who crawled in wrote down two years ago.

    BOX RUN · SPAN 7 · 14 STATIONS
BRIEFS 3 · PROFILES 27 · NIGHTLY 02:00

Who reads it

Read overnight on a structure like this one: the cycle's flight, the ΔT map, the box run and the element register against the previous list. Three of the 27 profiles wake up to it.

Structures engineer

PROFILE 17 / 27

08:00 · B-118 · SPAN 7

CONDITION

One mover on span 7: panel D-11's delamination grew 0.6 m² since last cycle while D-204's spall holds at 40 mm — the ranked list is cut, 41 anomalies, worst first, each on its element.

CITES: ΔT MAP 19:20 · CYCLE DIFF · ELEMENT D-11

Estimator

PROFILE 09 / 27

07:10 · B-118 · REPAIR PACKAGE

QUANTITY

The repair package prices from the record: 41 anomalies bounded in square metres, each on a named element with its photograph — quantities read off the model, not walked up on a Saturday.

CITES: DEFECT REGISTER · ΔT AREAS · ELEMENT INDEX

Safety director

PROFILE 16 / 27

05:55 · B-118 · DECK

EXPOSURE

Nobody hangs under the deck this cycle — 96 % of faces came back by air, the box interiors by the tracked unit, and both lanes carried traffic through the whole inspection.

CITES: ORBIT 19:20 · BOX RUN SPAN 7 · FACES 96%

SHEET · 5 OF 48 · BRIDGES

On the capability sheet

  1. AER-05

    Thermal & facade inspection

    The whole envelope inspected without a scaffold, defects marked on the elevation

    Δ0.1°C · FACADE 2CM DETAIL
  2. AUT-05

    Robotic inspection

    Thermal/RGB/360 asset rounds by robot

    ROUNDS 4/DAY
  3. QAS-02

    Observations & issues

    Anything seen, logged, assigned, and closed

    MEAN TTR 4.1H
  4. AER-02

    3D models & DEMs

    The site in three dimensions, measurable by anyone who opens it

    MESH 40M FACES · DEM 5CM
  5. QAS-01

    Inspection templates

    Your checklists, structured, on every phase gate

    TEMPLATES 214
The whole capability sheet5 OF 48 CAPABILITIES · THIS SECTOR

Figures are a specimen record, drawn to the platform's own conventions.

CONTACT · SALES · REPLY 1 BUS. DAY

Fly one cycle. Keep the element register.

Send us the span arrangement — we will fly one inspection cycle and hand you the element register, the ΔT map and the ranked defect list.