Skip to content
Ground Reality

Every mast, every antenna.

Lattice, monopole and rooftop — 12,400 sites audited from the air with nobody on the steel. Azimuth, tilt, radiation centre and the whole RF panel inventory measured off the capture, four times a year.

PORTFOLIO · 37 200 ANTENNAS · CLIMBS 0MAST · 12 400 SITES · CLIMBS 0
CAPTURE · MISSION 23 · 0.6CM DETAIL

Capture · Mission 23

FLY THE SECTOR.

The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.

MAST 4412 · 65.0M AGL · ORBIT R23MTX MUTE · 02:00 → 02:400.6CM DETAILWAYPOINTS 10

Sector · Telecom

SIXTY-FIVE METRES, AND NOBODY ON THE STEEL.

One governed helix around Mast 4412: four rings at twenty-three metres put every panel, mount and feeder run on the record — including the one on the top level that reads 138° where the file says 140 — then the unit walks the compound past a climb kit that stays laid out, and the finale draws the three microwave links out to the horizon.

RECORD · 12 400 MASTS · 4 RINGS

On the record here

  1. 01

    A structural and RF audit means a rigger, a permit, a rescue plan and a day per site. Twelve thousand four hundred sites makes that arithmetic impossible.

    The audit without the climb

    Four orbit rings at 23 m radius return every face of the steel — panels, remote radio units, mounts, feeder runs, guy fittings — with nobody leaving the ground.

    Robotic inspectionORBIT R 23M · 4 RINGS · CLIMBS 0
  2. 02

    Every co-location swap moves something, and the site file still says what the last engineer wrote down. Panels at 020°, 140° and 260° on paper; something else on the mast.

    Azimuth measured, not remembered

    The mesh gives azimuth, tilt and radiation centre off the geometry itself — 60.4 m on Mast 4412 — so the site file is corrected from the model instead of from memory.

    3D models & DEMsAZ 020/140/260° · TILT 4° · RAD CTR 60.4M
  3. 03

    Four audits a year across 12,400 masts is 49,600 visits. Scheduling that region by region and hoping is how a cycle slips a whole quarter.

    Twelve thousand sites, one calendar

    Every capture on the portfolio sits on one calendar with its window, its crew and its state — booked, flown, processed, on the record — so a slipped site is visible the day it slips.

    Mission schedulingSITES 12 400 · 4×/YR · ONE CALENDAR
CONTROL · MAST 4412 · 65.0M AGL
PL-23
MAST 4412 · AZ 020/140/260° · HELD ±1.4CM · CHECKED
FLEET · 12 400 MASTS · AUDIT 4×/YR

On the numbers

12,400 masts

Sites on one audited record

100%

Of audits closed with nobody on the steel

4×/yr

Full structural and RF audit cycles

ENERGIZED · TELECOM · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · 12 400 SITES · 4×/YR

The capture program

The program negotiates with the network, not with gravity: capture fits inside a 40-minute mute window granted at 02:00, and four rings around the mast replace the rigger, the permit and the rescue plan.

  1. 01

    Control fix

    Every site, before the first ring

    The mast is pinned to survey control before anything flies, so azimuth, tilt and radiation centre come off geometry that holds site to site and quarter to quarter.

    FIX ±1.4CM · SATS 31 · BASELINE 412M
  2. 02

    Mast orbit

    Inside the mute window, 02:00–02:40

    Four rings at 23 m radius return every face of the steel — panels, remote radio units, mounts, feeder runs — at 0.6 cm detail. Ring 3 ran at 02:14; the carrier was back on air at 02:40 and nobody climbed.

    ORBIT R 23M · 4 RINGS · 0.6CM
  3. 03

    Vertical face pass

    Ring to ring, up the feeder ladder

    The climb a rigger used to make is flown instead: the feeder ladder, the guy fittings and the aviation beacon inspected from the base pier to the finial, with the anchors at 52.0 m radius closed in the same pass.

    AGL 65.0M · GUYS 19MM EHS ×6 · ANCHORS R 52.0M
  4. 04

    Portfolio calendar

    All year, across every region

    Every capture sits on one calendar with its window, its crew and its state — booked, flown, processed, on the record — so a slipped site is visible the day it slips, not at the end of the quarter.

    SITES 12 400 · 4×/YR · VISITS 49 600
ASKED · 6 QUESTIONS · 6 FIGURES

Ask the record

  1. Q01

    Does the audit take the sector off air?

    Forty minutes, in a window the network chooses. The sector was muted at 02:00 in low traffic, ring 3 ran at 02:14, and the carrier was back on air at 02:40 with nobody on the steel.

    MUTE 02:00–02:40 · 40MIN · CLIMBS 0
  2. Q02

    How close is measured-from-a-drone, honestly?

    The model is pinned to control at ±1.4 cm on a 412 m baseline with 31 satellites, and the steel is captured at 0.6 cm detail. Close enough that panel B read 138° against a site file that said 140° — and the file was the one that was wrong.

    FIX ±1.4CM · 0.6CM · Δ2°
  3. Q03

    What replaces the rigger's tape and clinometer?

    The geometry itself. Azimuth, tilt and radiation centre are measured off the mesh — 020°, 140° and 260° at 4° tilt on Mast 4412, radiation centre 60.4 m — so the site file is corrected from the model instead of from memory.

    AZ 020/140/260° · TILT 4° · RAD CTR 60.4M
  4. Q04

    What does a site audit cost us now?

    The climb is gone: 6.0 hours of rigging time saved per site, no permit, no rescue plan, no day on the road for an audit that flies in a 40-minute window. Across the portfolio, that is 49,600 visits a year with nobody on the steel.

    PER SITE 6.0H SAVED · CLIMBS 0
  5. Q05

    Can you actually cover 12,400 sites four times a year?

    That is 49,600 captures, and every one sits on one calendar with its window, its crew and its state. A slipped site is visible the day it slips — which is how a cycle stops losing a quarter.

    SITES 12 400 · 4×/YR · ONE CALENDAR
  6. Q06

    What happens when the model and the site file disagree?

    The file is corrected from the model. Panel B's 138° went on the record at 02:38 with the frame behind it, the antenna schedule was amended, and the next audit measures against the corrected figure — 37,200 antennas kept honest this way.

    ANTENNAS 37 200 · FILE CORRECTED
BRIEFS 3 · PROFILES 27 · RECORD CLOSED 02:00

Who reads it

Read overnight on a portfolio like this one: last night's mute-window orbits, the antenna schedule against the site files, and the audit calendar at its current state. Three of the 27 profiles wake up to it.

RF engineer

PROFILE 25 / 27

06:20 · MAST 4412 · SECTOR B

AZIMUTH

Panel B measured 138° against a site file saying 140° — the file is corrected from the model, and sectors A and C hold at 020° and 260° with the radiation centre confirmed at 60.4 m.

CITES: RING 3 02:14 · MESH MEASURE · SCHEDULE A1–C1

Asset manager

PROFILE 13 / 27

06:40 · PORTFOLIO · 12 400 MASTS

EXPOSURE

The audit cycle holds across the portfolio: four a year on 12,400 sites, every capture booked, flown, processed or on the record — and a site that slips its window is named the day it slips, not found at quarter end.

CITES: MISSION CALENDAR · SITES 12 400 · AUDIT 4×/YR

Safety director

PROFILE 16 / 27

05:55 · MAST 4412 · COMPOUND

HAZARD

Nobody was on the steel last night and nobody is rostered onto it today: the audit closed from four rings at 23 m, the beacon and the guy hardware included, and the rescue plan was never stood up.

CITES: ORBIT LOG 02:40 · CLIMBS 0 · RINGS 4

SHEET · 4 OF 48 · TELECOM

On the capability sheet

  1. AUT-05

    Robotic inspection

    Thermal/RGB/360 asset rounds by robot

    ROUNDS 4/DAY
  2. AER-02

    3D models & DEMs

    The site in three dimensions, measurable by anyone who opens it

    MESH 40M FACES · DEM 5CM
  3. AUT-03

    Mission scheduling

    One calendar for every autonomous capture on the portfolio

    MISSIONS ON A CYCLE
  4. AER-03

    Accuracy, stated

    Every measurement states the accuracy it was made to

    FIX ±1.2CM · SATS 28
The whole capability sheet4 OF 48 CAPABILITIES · THIS SECTOR

Figures are a specimen record, drawn to the platform's own conventions.

CONTACT · SALES · REPLY 1 BUS. DAY

Orbit one mast. Correct the file.

Give us a site list — we will fly four rings around one mast in its mute window and hand you the measured azimuths, the antenna schedule and the corrected site file.