Skip to content
Ground Reality

THE NEIGHBORHOOD, DELIVERED.

Eighty-four hectares behind one gate: 1,240 homes in six phases, a clubhouse that lands in phase 6, and a boundary wall that has to be up before the first buyer drives in. Ground Reality flies the whole master plan twice a week — platforms, plinths, roofs, gatehouse — so every plot's stage, and the date it hands over, comes off the same capture.

CAPTURE · 2×/WK · 1.1CM DETAILHOMES 1,240 · PHASES 6 · GATE→CLOSE 14MO
CAPTURE · MISSION 24 · 1.1CM DETAIL

Capture · Mission 24

FLY THE SECTOR.

The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.

MASTER PLAN 84HA · 1,240 HOMES1.1CM DETAILWAYPOINTS 10

Sector · Communities

A HUNDRED ACRES, IN ONE PASS.

Through the arch, up the boulevard between its avenues, down the street still in build — platforms, slabs, frames, roofs, render, in that order — then four metres over the lake and round the cycle track. One governed pass reads every street inside the gate; then the operator walks the clubhouse lawn to the boardwalk and captures what a drone cannot: the terrace fall, the deck gap, the settled revetment toe.

PHASE 3 · 212 PLOTS · GATE 01

On the record here

  1. 01

    A master plan starts as a cut-and-fill exercise, and plot platforms get set from a level book written before the road alignment moved. By the time a plinth is 300 mm out, the driveway falls the wrong way and the storm drain has nowhere to go.

    Platforms before the first plinth

    Each capture gives the surface as it stands, meshed against the design platform: cut and fill by phase, by street and by plot, to ±1.5%. Muck is balanced inside the boundary instead of trucked out and bought back, and the plot that will not drain is named while it is still earth.

    Cut/fill & stockpilesPLATFORMS 212 · CUT/FILL ±1.5% · 2×/WK
  2. 02

    A gated development is one set of gangs cycling 1,240 homes. Send the blockwork crew to a street where the frame is still propped and the week is gone — and three months later nobody can say which street it went on.

    The same crews, six phases deep

    Crews are planned and dispatched against the stage each plot has actually reached, read off the weekly capture rather than off a foreman's list. The plan names the street, the gang and the day, and a plot that is not ready surfaces before the gang is standing in front of it.

    Crew planning & dispatchCREWS 40 · PLOTS 212 · DISPATCH DAILY
  3. 03

    The compound wall is up, the gate is hung, and the buyer walks their home for the first time. Eleven things get written on a sheet of paper at the gatehouse, and three of them are still open at the second visit.

    Snags closed before the gate opens

    Anything wrong is raised where it stands — photograph, plot, trade, due date — and closed with the evidence attached to it. Handover runs at 0.4 open items a plot, and the ones that hold a closing are visible to the site manager the same hour instead of at the end of the week.

    Observations & issuesPLOT 3-041 · 0.4 OPEN/PLOT · CLOSED 2.1D
PHASE SCHEDULE · GATE→CLOSE 14 MONTHS
PL. 07
PHASE 3 · POUR WINDOW 07:10–10:30 · GATE→CLOSE 14MO · 212 PLOTS
MASTER PLAN · 1,240 HOMES · WK 34

On the numbers

1,240

Homes on one master plan, staged off one capture

6

Phases handed over street by street through one gate

14 MO

Measured gate-to-close cycle, earthworks to keys

BUILDINGS · COMMUNITIES · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · 2×/WK · 84 HA

The capture program

Everything on this program goes through one gate — the flight lands before the queue forms, the pour window is booked against it, and the board is rebuilt before it closes for the night. Fourteen months, earthworks to keys, and the record never leaves the wall.

  1. 01

    Master-plan flight

    2×/week, at 06:20, before the gate queue forms

    One capture takes the whole master plan — platforms, plinths, roofs, gatehouse — in 38 minutes. Every plot's stage, and the date it hands over, comes off the same flight.

    84 HA · 1.1CM DETAIL · 38MIN
  2. 02

    Platform differencing

    Every flight, while the phase is still earth

    Each plot platform is meshed against design — cut and fill by phase, by street, by plot. Muck is balanced inside the boundary instead of trucked out and bought back, and the plot that will not drain is named while it is still earth.

    PLATFORMS 212 · CUT/FILL ±1.5%
  3. 03

    Facade snag pass

    On the plots at finishes, before the compound wall goes up

    The serpentine reads the elevation close enough to snag it. Handover runs at 0.4 open items a plot, closed in 2.1 days with the evidence attached — before the buyer walks it, not after.

    96 STATIONS · 0.4CM DETAIL · PLOT 3-042
  4. 04

    Stage read

    Every capture, board rebuilt by 17:50

    Crews are planned against the stage each plot has actually reached. The plan names the street, the gang and the day, and a plot that is not ready surfaces before the gang is standing in front of it.

    PLOTS 212 · CREWS 40 · DISPATCH DAILY
ASKED · 6 QUESTIONS · 6 FIGURES

Ask the record

  1. Q01

    Can one capture carry 1,240 homes?

    Yes. The master plan is flown in 38 minutes at 1.1 cm detail — 212 plots in phase 3 staged off it, 1,240 homes across six phases on one record, and the gatehouse on the same sheet as the farthest street.

    HOMES 1,240 · PHASES 6 · 38MIN
  2. Q02

    How do we balance the earthworks inside the wall?

    By measuring them while they are still earth. Cut and fill reads to ±1.5% by phase, street and plot, so muck moves inside the boundary instead of out the gate — and the platform set from a stale level book is caught before the plinth is on it.

    PLATFORMS 212 · CUT/FILL ±1.5%
  3. Q03

    How do forty crews cycle six phases without a lost week?

    Dispatch runs against the stage each plot has reached on the capture, not against a foreman's list. The plan names the street, the gang and the day — and the frame that is still propped surfaces before the blockwork crew arrives at it.

    CREWS 40 · DISPATCH DAILY
  4. Q04

    Residents live in 3A while we build 3B — how does that work?

    On the gate's clock. The roof pour on plot 3-044 was booked into a window — 26 m³, one pump, gate held 07:10 to 10:30 — and the last truck cleared before the street went back to the people who live on it.

    POUR WINDOW 07:10–10:30 · 26M³
  5. Q05

    What does handover look like at the gatehouse?

    Quiet. Snags run at 0.4 open items a plot, raised where they stand with the photograph and the trade attached, closed in 2.1 days — and the one that would hold a closing is visible the same hour, not at the end of the week.

    SNAGS 0.4/PLOT · CLOSED 2.1D
  6. Q06

    Does the buyer's date hold?

    The cycle is measured at 14 months, gate to close, and closings land on their date 98% of the time — phase 3B closes 14 Nov because the board has said so all year, plot by plot.

    GATE→CLOSE 14MO · ON DATE 98%
BRIEFS 3 · PROFILES 27 · FIRST CUT 05:40

Who reads it

Read overnight behind a gate like this one: two flights, the platform meshes, the pour log, and every open item in phase 3. Three of the 27 profiles wake up to it.

Superintendent

PROFILE 04 / 27

05:40 · GATE 01 · PHASE 3B

SEQUENCE

The pour window on 3-044 opens at 07:10 — 26 m³, one pump, gate booked to 10:30. Hold the blockwork deliveries for 3-045 until the last truck clears.

CITES: POUR WINDOW 07:10 · GATE 01 · FLIGHT 06:20

Safety director

PROFILE 16 / 27

05:55 · PHASE 3A · OCCUPIED

HAZARD

Thirteen plots in phase 3 are lived in, and the pour traffic shares their street — the trucks hold to the 07:10–10:30 window, and the gate record shows the last one out.

CITES: GATE 01 RECORD · 13 CLOSED · POUR WINDOW

CFO

PROFILE 11 / 27

06:55 · MASTER PLAN · 6 PHASES

CASH

Fourteen months of land cost turns at the gate: phase 3B closes 14 Nov on a measured cycle, and every closing carries its walk — 0.4 open items a plot, closed in 2.1 days.

CITES: BOARD 17:50 · CLOSE 14 NOV · SNAGS 0.4/PLOT

SHEET · 5 OF 48 · COMMUNITIES

On the capability sheet

  1. AER-04

    Cut/fill & stockpiles

    Earthworks quantities and stockpile volumes reconciled against design

    VOLUME ±1.8% · NIGHTLY
  2. WFC-01

    Crew planning & dispatch

    The right crew on the right day, portfolio-wide

    UTIL 87%
  3. QAS-02

    Observations & issues

    Anything seen, logged, assigned, and closed

    MEAN TTR 4.1H
  4. AER-01

    Orthomosaic maps

    Survey-grade 2D maps from any drone flight

    1.8CM DETAIL · 214 HA/FLIGHT
  5. PMG-04

    Scheduling & lookaheads

    Lookaheads that read capture velocity, not optimism

    WK-34 LOOKAHEAD
The whole capability sheet5 OF 48 CAPABILITIES · THIS SECTOR

Figures are a specimen record, drawn to the platform's own conventions.

CONTACT · SALES · REPLY 1 BUS. DAY

One gate. One record. Fourteen months.

Send us the master plan and the phase lines — we will fly it twice in one week and hand you the platform balance, the stage board, and the plots that will not drain.