The as-built nobody had to draw.

A handover pack is usually manufactured — assembled at the end, from memory, by the people least able to remember. Ours is not assembled. It is the record, dated at the epoch the keys changed hands: what was built, what is behind the wall, what is under the ground, and what was still moving when the retention fell due.

HANDOVER · EPOCH E-42 · DLP 365 DSPECIMEN SITE · ILLUSTRATIVE RECORD
Record header · sheet R-04
Record
SPECIMEN SITE 07
Epochs held
55
Handover epoch
E-42 · 21 APR 2025
Concealed epochs
31
Liability period
365 D
Release epoch
E-55 · 21 APR 2026
Stations
±1.0 M REPEAT
First epoch · 18 Jun 202355 epochs on the recordLatest · 21 Apr 2026
CONCEALED · E-14 · BEFORE CLOSE-UP

Behind the drywall

The wall remembers what the drawing forgot.

Drag the seam. Left is corridor C2 as it was handed over; right is the same elevation the week before the boarders arrived — duct, tray, sprinkler main, and the chilled-water isolation valve now sitting a metre and a half above the floor behind twelve and a half millimetres of plasterboard. Both states are the same measured setting-out, so every level on the right lands where the left says it should.

Corridor C2 · level 04 · internal elevationHandover epoch E-42 · concealed epoch E-14
AS HANDED OVERE-14 · BEFORE CLOSE-UP
CONCEALED · 4 ELEMENTS · LEVELS TO FFLWIPE 44% · DRAG OR USE ARROW KEYS
Concealed elements in corridor C2, level 04, captured at epoch E-14 before the wall was closed up.
RefElementLevelChainageNote
MEP-118Duct, 400 × 250 galvanisedSOFFIT 3,150 AFFLCH 300 – 8,70070 mm below rev C. Deviation accepted, VAR-118.
MEP-124Cable tray, 300 wide2,950 AFFLCH 300 – 8,700Conduit drop to faceplate at CH 6,400.
MEP-131Sprinkler main, DN803,050 AFFLCH 300 – 8,700Three pendant drops through the ceiling grid.
MEP-147Chilled water drop, DN50 pairVALVE 1,555 AFFLCH 5,400Isolation valve concealed behind 12.5 mm board, 640 mm off the door head.
Levels are to finished floor level, taken from the capture, not from the model. Where the two disagree the capture is the record and the difference is stated.

Opening a wall to find a valve costs more than the capture that would have found it.

One pass per zone, between services complete and boarding

Levels taken from the capture, not from the model

Deviations stated with the variation that accepted them

PRE-CLOSE-UP · 1 PASS · LEVELS TO FFL
AS-BURIED · E-31 · 31 H OF VISIBILITY

Below the ground

The only day the underground is visible is the day you bury it.

Nobody funds a geophysical survey of their own site. Nobody has to: construction opens the ground for free, once, and closes it within a day or two. Capture at exposure turns that window into a permanent section — invert levels, offsets to the grid, bedding, tape.

Every strike, every exploratory hole and every re-survey after this point is paid for out of the same absence: nobody wrote down what they could see. A section captured at exposure is the cheapest measurement on the job and the one still being read in thirty years.

TRENCH · CAPTURE BEFORE BACKFILL · ONE PASS
Section A-A · service trench · CH 240Epoch E-31 · captured at exposure
1,550GL 102.35IL 100.80FORMATION 100.40DI DN300 WATER4 × Ø150 POWERØ110 COMMSMARKER TAPE 101.90 · AT BACKFILLGRID DLEVELS TO SITE DATUM · METRES
WATER MAIN
DI DN300 · IL 100.80 · OFFSET 1,550 FROM GRID D
POWER DUCTS
4 × Ø150 PVC · CROWN 101.20 · SPACER 300 CRS
COMMS DUCT
Ø110 PVC · CROWN 101.40 · DRAW ROPE FITTED
BEDDING
10 MM SINGLE-SIZE · 100 UNDER · 150 OVER
MARKER TAPE
101.90 · OVER EACH SERVICE · AT BACKFILL
BACKFILL
AS-DUG · 250 LIFTS · 6 PASSES
E-31 · OPEN 12 MAR 08:41 · BACKFILLED 13 MAR 15:20Thirty-one hours of visibility, recorded once, worth reading for as long as the pipe is there.
DLP · 365 D · CLOSED BY CAPTURE

Retention and the liability period

A year measured, not argued.

Practical completion is the start of the most expensive year of the job to get wrong. Scroll it. Each defect is a longitudinal object: first observed at an epoch, re-measured at every epoch after it, closed only when a capture shows the change. At day 365 the balance of retention is due against measured condition — including the two items that are still moving, stated with their rate.

Defects liability · 365 days from practical completionDay 365 / 365 · open 2 · closed 2
E-42PCE-45E-47E-49E-52E-55RELD-070.91.21.51.61.61.6CLOSEDmmD-121.23.80.0CLOSEDm²D-194.07.09.011.0OPENmmD-232.43.1OPENm runDAY 0DAY 91DAY 182DAY 273DAY 365
Defect register at the end of the liability period: two items closed by capture, two measured open at release.
RefLocationMeasuredFirst seenLatestGrowthStatus
D-07South abutment, wall 3Resin injected day 251. Arrested: no growth across two epochs.Crack widthDAY 01.6 mm+0.7 mm/yrCLOSED · E-52
D-12Plant room 04-P2Roof outlet re-formed day 201. Closed on the capture that showed it dry.Damp stainingDAY 920.0 m²-2.9 m²/yrCLOSED · E-49
D-19Apron slab, bay 6Open at release. Still moving: growth measured across four epochs.SettlementDAY 18211.0 mm+14.0 mm/yrOPEN
D-23Parapet, joint J-14Open at release. Raised on the penultimate epoch.Sealant failureDAY 3063.1 m run+4.3 m run/yrOPEN
RETENTION · 5.0% · HALF AT PC · BALANCE AT DAY 365Balance DUE · 2 ITEMS MEASURED OPEN

Retention is released against measured condition, not against an opinion of it.

Release epoch walks the handover epoch's stations, ±1.0 m

Growth quoted per year, from the readings that produced it

An item still moving is stated as still moving

HANDOVER EPOCH E-42 · RELEASE EPOCH E-55
PACK · 6 PARTS · ALREADY ON THE RECORD

What changes hands

Six things, none of them assembled at the end.

Each one exists because the record was running while the work happened. Nothing here is produced for the handover; the handover is a date applied to what is already held.

As-built geometry

Not a drawing redrawn from memory at the end of the job. The measured state of the works at the handover epoch, at the same stations the next capture will use.

HANDOVER EPOCH · E-42 · STATIONS FIXED

Concealed services

Everything the finishes now hide, captured the week before they hid it: levels to finished floor, chainages, deviations against the coordination model, accepted variations named.

CONCEALED · 31 EPOCHS · LEVELS TO FFL

Below-grade services

Every trench captured at exposure, before backfill. Invert levels, offsets to the grid, bedding and tape depths — recorded during the one window in which they were visible.

AS-BURIED · CAPTURED AT EXPOSURE

Component identity

Serial and batch numbers bound to the position each unit was installed in, so a warranty claim, a recall or a replacement starts from a location rather than a search.

SERIAL · BOUND TO POSITION

Witnessed hold points

The moments somebody had to see before the work was covered: witnessed on a dated epoch, released under delegated authority, and readable years later as the epoch they were witnessed on.

HOLD POINT · DATED EPOCH · RELEASED

The defect register

Every item a longitudinal object with its own measurements — first observed, measured at each epoch, growth rate, closed only when a capture shows the change.

DEFECT · MEASURED · NOT ADJECTIVAL
QUESTIONS OF RECORD · 6 · STATED FLAT

Questions of record

The prerequisites, in the headline register.

What it costs in capture time, when it has to happen, and what carries on afterwards.

01When does the as-built get made?
It does not get made. It accumulates. Every epoch is registered into one spatial frame as the job runs, so the state of the works at practical completion is a date on a record that already exists — not a deliverable somebody assembles from photographs in the last fortnight.
02What does it take to capture behind the drywall?
One pass per zone before close-up, in the window between services complete and boarding. It is the cheapest capture on the programme and the one that pays for the longest: the alternative is a wall opened on a guess.
03And below ground?
One pass per open trench before backfill. The ground is only transparent while it is open — on this specimen the window was 31 hours — and it never comes back on the same terms.
04How does a defect close?
On evidence. A directive closes when a capture shows the change, not when somebody ticks a box and not because the period ended. An item still moving at release is stated as still moving, with its rate in units per year.
05What happens to the record after the liability period?
It keeps running: the same frame, the same stations, the same measurements carrying their units and their ±, into operation, inspection regimes and refurbishment. The site does not stop existing at handover, so neither does the record.
06Who holds it?
The organisation that captured it, with access controlled down to the part of the site. What passes at handover is access to what already exists, on the terms written into the contract.
HANDOVER EPOCH E-42 · RELEASE EPOCH E-55 · STATIONS ±1.0 M
RECORD · ONE · EVERY PHASE · DECADES

One record. Every phase. Decades.

The as-built is a byproduct of having captured at allConcealed and buried work recorded while it was visibleThe liability year measured epoch by epochHANDOVER · A DATE, NOT A DELIVERABLE
CONTACT · SALES · REPLY 1 BUS. DAY

Hand over the record, not a box of PDFs.

Bring a job approaching completion, or an asset you inherited with nothing behind it. We will show you what a handover epoch is worth on day 366.