BUILT IN SEMESTERS.

Eighteen buildings across five phases, and a quad carrying twelve thousand movements a day straight past the works. Ground Reality flies the whole campus six times a week, keeps the pedestrian spine and the service tunnel on the same record as the blocks, and hands each phase over before term instead of during it.

CAPTURE · 6 PASSES/WK · 1.4CM DETAILBUILDINGS 18 · PHASES 5 · TERMS KEPT
CAPTURE · MISSION 30 · 1.4CM DETAIL

Capture · Mission 30

FLY THE SECTOR.

The sheet above is a drawing of this. 10 capture waypoints, and every finding called as the aircraft reaches it — scroll sets the target, the mission keeps its own pace, and the page waits for it.

CAMPUS · 18 BUILDINGS · PH 1–51.4CM DETAILWAYPOINTS 10

Sector · Campuses

BUILT IN SEMESTERS.

Eighteen buildings across five phases, and a quad carrying twelve thousand movements a day straight past the works. One governed pass reads the spine at walking pace, the amphitheatre, the playground and a match in progress, threads the library atrium between its two bridges, and runs the spine again with the service tunnel drawn as a solid under the lawn. Then the operator crosses the reinstated paving and captures what a drone cannot: 8 mm of lippage, the invert pin at CH-02, and the 6.40 m the spine reopens at.

CAMPUS · 18 BUILDINGS · PHASES 1–5

On the record here

  1. 01

    Twelve thousand pedestrian movements a day cross a campus that is also a construction site. Every crane lift, delivery and hoarding move puts plant and students on the same square of ground, and the walk to a nine o'clock lecture does not detour.

    A quad that stays open

    Capture is read for the hazards that matter on a live campus — a hoarding line breached, a crossing blocked, plant moving against the pedestrian spine — and the observation lands with the frame that shows it, assigned before the next delivery slot opens.

    Safety AIMOVEMENTS 12,000/DAY · SPINE 6.4M CLEAR
  2. 02

    A term date is not a milestone, it is a fact: the students arrive on the Monday whether the block is finished or not. The programme still says September, and it says so because it said so in March.

    Phases that land before term

    Lookaheads are cut from measured progress across all five phases — six passes a week, block by block — so a slipping phase reads as a date against the academic calendar while there is still a vacation's worth of float to spend on it.

    Scheduling & lookaheadsPHASES 5 · PASSES 6/WK · T−2 DAYS
  3. 03

    Chilled water, steam and IT all leave the energy centre in one 3.20 × 2.60 m tunnel under the quad. Eight years later the estates team needs a valve isolated, and the as-built says one thing while the tunnel says another.

    What runs under the lawn

    The tunnel is walked before the lawn goes back — frames pinned to the plan within ±0.3 m, dated at the invert. It stays standing in the record long after the turf has closed over it, for whoever lifts the access cover next.

    360° walksTUNNEL 3.20×2.60M · INVERT −4.20 · PIN ±0.3M
SEMESTER PHASING · P3 HANDOVER · T−2 DAYS
PL. 03
PHASE 3 · HANDOVER SATURDAY · TERM MONDAY 09:00 · SPINE OPEN 16:10
PHASE 3 · T−2 DAYS · WK 34

On the numbers

18

Buildings phased around a quad that never closes

5

Phases delivered against the academic calendar

0

Terms that started late because a handover slipped

BUILDINGS · CAMPUSES · 32 SECTORS ON THE SHEETEvery sector we work in
PROGRAM · 6 PASSES/WK · 5 PHASES

The capture program

Five phases, one immovable calendar. The campus is flown before the first delivery, the block in build is orbited as it closes, and what runs under the lawn is walked before the turf goes back — term starts Monday 09:00 either way, and the program's job is to make that boring.

  1. 01

    Campus pass

    6×/week, at 06:20, before the first delivery reaches the gate

    All five phases land on one capture, block by block, before the campus wakes. Progress is cut against the academic calendar, and the spine is read for the hazards that matter where plant and students share the ground.

    6 LINES · 1.4CM DETAIL · 45MIN
  2. 02

    Tunnel walk

    Before the lawn goes back, and at every change after

    Chilled water, steam and IT are walked and pinned to the plan before the turf closes over them. The tunnel stays standing in the record for whoever lifts the access cover in year eight.

    3.20×2.60M · INVERT −4.20 · PIN ±0.3M
  3. 03

    Facade orbit

    On the block in build, as the envelope closes

    The library's elevation is orbited close as it finishes, so the snag close-out runs against frames of the actual facade — five bays or fourteen, the record does not care how big the block is.

    ORBIT C–C′ · 0.9CM DETAIL · 40MIN
  4. 04

    Handover walk

    Each phase, on the Saturday before term

    The finished blocks are walked into the estates record the day the hoarding comes off the spine. Monday's 12,000 movements meet a whole quad, and estates starts term with the as-built instead of a box of PDFs.

    BLOCKS 5 · HOARDING OFF 16:10 · TERM MON 09:00
ASKED · 5 QUESTIONS · 5 FIGURES

Ask the record

  1. Q01

    Do we fence off the quad while you capture?

    No. The pass flies at 06:20 and is done in 45 minutes, before the first delivery reaches the gate — the quad has stayed open through all five phases, and the capture is part of why.

    QUAD 0.9HA · OPEN 5 PHASES
  2. Q02

    How do we know September is real in March?

    Because the lookahead is cut from measured progress, six passes a week across all five phases. A slipping phase reads as a date against the academic calendar while there is still a vacation's worth of float to spend on it.

    PASSES 6/WK · SLIP READS AS A DATE
  3. Q03

    What keeps plant and twelve thousand students apart?

    The record, every morning. Capture is read for a hoarding line breached, a crossing blocked, plant moving against the pedestrian spine — and the observation lands with the frame that shows it, assigned before the next delivery slot opens.

    MOVEMENTS 12,000/DAY · SPINE 6.4M CLEAR
  4. Q04

    What does estates actually receive at handover?

    The record, walked. Five blocks handed over on frames pinned to the plan, and the service tunnel — 3.20 × 2.60 m, chilled water, steam and IT — pinned within ±0.3 m and dated at the invert before the lawn went back over it.

    BLOCKS 5 · TUNNEL PIN ±0.3M
  5. Q05

    Has a term ever started late?

    Zero so far — phase 1 landed in September '21, phase 2 in September '22, phase 3 in August '24, phase 4 in January '25, every one before term. Phase 5 lands in 2027 on the same rule.

    TERMS LATE 0 · P5 2027
BRIEFS 3 · PROFILES 27 · FIRST CUT 05:40

Who reads it

Read overnight on a campus like this one: six passes, the phase lookaheads, the spine frames, and the tunnel walk. Three of the 27 profiles wake up to it.

Superintendent

PROFILE 04 / 27

05:40 · PHASE 3 · LIBRARY

SEQUENCE

Snag close-out on the library runs 07:30 to 12:40 and the hoarding comes off the spine at 16:10 — hold the last delivery until the crossing reopens, and Saturday's handover stands.

CITES: PASS 06:20 · SNAG LIST · HOARDING 16:10

Safety director

PROFILE 16 / 27

05:55 · SPINE · GATE TO GATE

HAZARD

Nobody walks the hoarding line to prove it holds — it reads off the 06:20 pass, and a blocked crossing on the spine lands assigned before the first delivery slot opens.

CITES: PASS 06:20 · SPINE 6.4M · TC-02 R 34.4M

VDC manager

PROFILE 19 / 27

07:30 · TUNNEL · INVERT −4.20

HANDOVER

The tunnel walk closes the estates record: chilled water, steam and IT pinned within ±0.3 m before the lawn goes back — the as-built and the tunnel finally say the same thing.

CITES: TUNNEL WALK 08:00 · PIN ±0.3M · ESTATES RECORD

SHEET · 5 OF 48 · CAMPUSES

On the capability sheet

  1. QAS-04

    Safety AI

    Every frame scanned for OSHA-aligned hazards

    EVERY FRAME · RANKED
  2. PMG-04

    Scheduling & lookaheads

    Lookaheads that read capture velocity, not optimism

    WK-34 LOOKAHEAD
  3. GRD-01

    360° walks

    Weekly floor walks auto-pinned to drawings

    8 FLOORS/HR · AUTO-PINNED
  4. GRD-06

    Privacy blurring

    Faces and bodies blurred automatically before anyone sees a frame

    AUTO · 100% OF FRAMES
  5. AUT-03

    Mission scheduling

    One calendar for every autonomous capture on the portfolio

    MISSIONS ON A CYCLE
The whole capability sheet5 OF 48 CAPABILITIES · THIS SECTOR

Figures are a specimen record, drawn to the platform's own conventions.

CONTACT · SALES · REPLY 1 BUS. DAY

Capture one phase. Keep the term.

Send us the phasing plan and the term dates — we will fly the campus for one week, cut the lookahead against the calendar, and walk what is under the lawn before it disappears.